Friday, May 3, 2013

Meeting 5/2/2013


Date: 5/2/2013
Time: 5:00 PM
Place: Capstone Laboratory
Assistance:

  • José D. Fernández
  • Samuel Carlo
  • Frances Acevedo
  • Marycarmen Torres
  • Carlos Cruz
Agenda:
  • Items Arrived:
    • New microprocessor for barcode scanner
  • Progress:
    • José D. Fernández- Improving inventory system web app
    • Frances Acevedo- Improving mobile web app
    • Samuel Carlo- Improving inventory system web app, changed XBee USB interface to help with deciphering barcode from barcode scanner, barcodes successfully sent to web app
    • Marycarmen Torres- XBee Programming with MSP430, fans, and barcode scanner, soldering and testing cooling system
    • Carlos Cruz- XBee programming with MSP430 and new microprocessor, fans, and barcode scanner, testing cooling system, barcodes successfully sent to XBee USB interface
  • Problems?
    • None at the moment, running back on schedule
Responsibilities for next period:
  • José D. Fernández- Keep improving on inventory system web app
  • Samuel Carlo- Keep improving inventory system web app
  • Frances Acevedo- Keep improving mobile web app
  • Marycarmen Torres- XBee programming with MSP430, solder and test cooling system circuit
  • Carlos Cruz- XBee programming with MSP430, Barcode scanner

Next Meeting: 5/6/2013, 5:00 PM, Capstone Laboratory

Meeting 4/30/2013


Date: 4/30/2013
Time: 5:00 PM
Place: Capstone Laboratory
Assistance:

  • José D. Fernández
  • Samuel Carlo
  • Frances Acevedo
  • Marycarmen Torres
  • Carlos Cruz
Agenda:
  • Items Arrived:
    • None since last meeting
  • Progress:
    • José D. Fernández- Improving inventory system web app
    • Frances Acevedo- Improving mobile web app
    • Samuel Carlo- Improving inventory system web app
    • Marycarmen Torres- XBee Programming with MSP430, fans, soldering cooling system circuit
    • Carlos Cruz- XBee programming with MSP430, fans, helping with cooling system
  • Problems?
    • New microprocessor for barcode scanner has not arrived; running very behind schedule
Responsibilities for next period:
  • José D. Fernández- Keep improving on inventory system web app
  • Samuel Carlo- Keep improving inventory system web app
  • Frances Acevedo- Keep improving mobile web app
  • Marycarmen Torres- XBee programming with MSP430, keep soldering cooling system circuit
  • Carlos Cruz- XBee programming with MSP430

Next Meeting: 5/2/2013, 5:00 PM, Capstone Laboratory

Meeting 4/25/2013


Date: 4/25/2013
Time: 5:00 PM
Place: Capstone Laboratory
Assistance:

  • José D. Fernández
  • Samuel Carlo
  • Frances Acevedo
  • Marycarmen Torres
  • Carlos Cruz
Agenda:
  • Items Arrived:
    • None since last meeting
  • Progress:
    • José D. Fernández- Improving inventory system web app
    • Frances Acevedo- Improving mobile web app
    • Samuel Carlo- Improving inventory system web app
    • Marycarmen Torres- XBee Programming with MSP430, fans, and barcode scanner, setting up cooling system circuit for testing
    • Carlos Cruz- XBee programming with MSP430, fans, and barcode scanner, helping with cooling system
  • Problems?
    • New microprocessor for barcode scanner has not arrived; running behind schedule
Responsibilities for next period:
  • José D. Fernández- Keep improving on inventory system web app
  • Samuel Carlo- Keep improving inventory system web app
  • Frances Acevedo- Keep improving mobile web app
  • Marycarmen Torres- XBee programming with MSP430, solder cooling system circuit
  • Carlos Cruz- XBee programming with MSP430, Barcode scanner

Next Meeting: 4/30/2013, 5:00 PM, Capstone Laboratory

Meeting 4/23/2013


Date: 4/23/2013
Time: 5:00 PM
Place: Capstone Laboratory
Assistance:

  • José D. Fernández
  • Samuel Carlo
  • Frances Acevedo
  • Marycarmen Torres
  • Carlos Cruz
Agenda:
  • Items Arrived:
    • None since last meeting
  • Progress:
    • José D. Fernández- Improving inventory system web app
    • Frances Acevedo- Improving informational website, improving mobile web app
    • Samuel Carlo- Improving inventory system web app, added Internet functionality to XBee USB interface
    • Marycarmen Torres- XBee Programming with MSP430, fans, and barcode scanner, setting up cooling system circuit for testing
    • Carlos Cruz- XBee programming with MSP430, fans, and barcode scanner, helping with cooling system
  • Problems?
    • Technical difficulties with barcode scanner compounding. We will order another microprocessor with a dedicated USB port, rather than use UART.
Responsibilities for next period:
  • José D. Fernández- Keep improving on inventory system web app
  • Samuel Carlo- Keep improving inventory system web app
  • Frances Acevedo- Keep improving mobile web app
  • Marycarmen Torres- XBee programming with MSP430, improve cooling system circuit
  • Carlos Cruz- XBee programming with MSP430, Barcode scanner

Next Meeting: 4/25/2013, 5:00 PM, Capstone Laboratory

Meeting 4/18/2013


Date: 4/18/2013
Time: 5:00 PM
Place: Capstone Laboratory
Assistance:

  • José D. Fernández
  • Samuel Carlo
  • Frances Acevedo
  • Marycarmen Torres
  • Carlos Cruz
Agenda:
  • Items Arrived:
    • None since last meeting
  • Progress:
    • José D. Fernández- Improving inventory system web app
    • Frances Acevedo- Improving informational website, improving mobile web app
    • Samuel Carlo- Improving inventory system web app, adding Internet functionality to XBee USB interface
    • Marycarmen Torres- XBee Programming with MSP430, fans, and barcode scanner, setting up cooling system circuit for testing
    • Carlos Cruz- XBee programming with MSP430, fans, and barcode scanner, helping with cooling system
  • Problems?
    • Barcode scanner still not working, signal near impossible to decrypt
Responsibilities for next period:
  • José D. Fernández- Keep improving on inventory system web app
  • Samuel Carlo- Keep improving inventory system web app, keep adding Internet functionality to XBee USB interface
  • Frances Acevedo- Keep improving mobile web app
  • Marycarmen Torres- XBee programming with MSP430, improve cooling system circuit
  • Carlos Cruz- XBee programming with MSP430, Barcode scanner

Next Meeting: 4/23/2013, 5:00 PM, Capstone Laboratory

Meeting 4/16/2013

Date: 4/16/2013
Time: 5:00 PM
Place: Capstone Laboratory
Assistance:

  • José D. Fernández
  • Samuel Carlo
  • Frances Acevedo
  • Marycarmen Torres
  • Carlos Cruz
Agenda:
  • Items Arrived:
    • None since last meeting
  • Progress:
    • José D. Fernández- Improving inventory system web app
    • Frances Acevedo- Improving informational website, improving mobile web app
    • Samuel Carlo- Improving inventory system web app, adding Internet functionality to XBee USB interface
    • Marycarmen Torres- XBee Programming with MSP430, fans, and barcode scanner, setting up cooling system circuit for testing
    • Carlos Cruz- XBee programming with MSP430, fans, and barcode scanner, helping with cooling system
  • Problems?
    • None at the moment
Responsibilities for next period:
  • José D. Fernández- Keep improving on inventory system web app
  • Samuel Carlo- Keep improving inventory system web app, keep adding Internet functionality to XBee USB interface
  • Frances Acevedo- Keep improving mobile web app
  • Marycarmen Torres- XBee programming with MSP430, improve cooling system circuit
  • Carlos Cruz- XBee programming with MSP430, Barcode scanner

Next Meeting: 4/18/2013, 5:00 PM, Capstone Laboratory

Meeting 4/11/2013

Date: 4/11/2013
Time: 5:00 PM
Place: Capstone Laboratory
Assistance:

  • José D. Fernández
  • Samuel Carlo
  • Frances Acevedo
  • Marycarmen Torres
  • Carlos Cruz
Agenda:
  • Items Arrived:
    • None since last meeting
  • Progress:
    • José D. Fernández- Finished inventory system web app
    • Frances Acevedo- Finished informational website, finished mobile web app
    • Samuel Carlo- XBee USB interface completed, helping José with web app
    • Marycarmen Torres- XBee Programming with MSP430, fans, and barcode scanner, setting up cooling system circuit for testing
    • Carlos Cruz- XBee programming with MSP430, fans, and barcode scanner, helping with cooling system
  • Problems?
    • Barcode scanner arrived very late; may not be able to have finished part for oral exam
Responsibilities for next period:
  • José D. Fernández- Keep working on inventory system web app
  • Samuel Carlo- Keep working on inventory system web app, keep working on XBee USB interface console program
  • Frances Acevedo- Keep working on mobile web app
  • Marycarmen Torres- XBee programming with MSP430, fix up cooling system circuit
  • Carlos Cruz- XBee programming with MSP430, Barcode scanner

Next Meeting: 4/16/2013, 5:00 PM, Capstone Laboratory

Meeting 4/9/2013

Date: 4/9/2013
Time: 5:00 PM
Place: Capstone Laboratory
Assistance:

  • José D. Fernández
  • Samuel Carlo
  • Frances Acevedo
  • Marycarmen Torres
  • Carlos Cruz
Agenda:
  • Items Arrived:
    • Barcode scanner
  • Progress:
    • José D. Fernández- Finishing inventory system web app
    • Frances Acevedo- Finished informational website, starting mobile web app
    • Samuel Carlo- XBee USB interface completed, helping José with web app
    • Marycarmen Torres- XBee Programming with MSP430, fans, and barcode scanner, setting up cooling system circuit for testing
    • Carlos Cruz- XBee programming with MSP430, fans, and barcode scanner
  • Problems?
    • Barcode scanner arrived very late; may not be able to have finished part for oral exam
Responsibilities for next period:
  • José D. Fernández- Keep working on inventory system web app
  • Samuel Carlo- Finish calendar, finances graph
  • Frances Acevedo- Keep working on mobile web app
  • Marycarmen Torres- Finish setting up and testing cooling system circuit
  • Carlos Cruz- Set up barcode scanner circuit

Next Meeting: 4/11/2013, 5:00 PM, Capstone Laboratory

Meeting 4/4/2013

Date: 4/4/2013
Time: 5:00 PM
Place: Capstone Laboratory
Assistance:

  • José D. Fernández
  • Samuel Carlo
  • Frances Acevedo
  • Marycarmen Torres
  • Carlos Cruz
Agenda:
  • Items Arrived:
    • One industrial fan, and small fan for box
  • Progress:
    • José D. Fernández- Elaborating web pages for inventory system web app
    • Frances Acevedo- Progressing on Informational website
    • Samuel Carlo- XBee USB interface, progress with receiving data
    • Marycarmen Torres- XBee Programming with MSP430
    • Carlos Cruz- XBee programming with MSP430
  • Problems?
    • Barcode scanner has not arrived yet
Responsabilities for next period:
  • José D. Fernández- Keep working on inventory system web app
  • Samuel Carlo- Finish XBee USB interface
  • Frances Acevedo- Finish informational website
  • Marycarmen Torres- Continue XBee and MSP430 programming
  • Carlos Cruz- Continue XBee and MSP430 programming

Next Meeting: 4/9/2013, 5:00 PM, Capstone Laboratory

Meeting 4/2/2013

Date: 4/2/2013
Time: 5:00 PM
Place: Capstone Laboratory
Assistance:

  • José D. Fernández
  • Samuel Carlo
  • Frances Acevedo
  • Marycarmen Torres
  • Carlos Cruz
Agenda:
  • Items Arrived:
    • None since last meeting
  • Progress:
    • José D. Fernández-Testing DB tables, creating prototype web pages for inventory system web app
    • Frances Acevedo- Informational website started
    • Samuel Carlo- XBee USB interface started
    • Marycarmen Torres- XBee Programming with MSP430
    • Carlos Cruz- XBee programming with MSP430
  • Problems?
    • Parts that have not arrived yet
Responsabilities for next period:
  • José D. Fernández- Elaborate on inventory system web app
  • Samuel Carlo- Keep working on XBee computer interface
  • Frances Acevedo- Keep working on informational website
  • Marycarmen Torres- Continue XBee and MSP430 programming
  • Carlos Cruz- Continue XBee and MSP430 programming

Next Meeting: 4/4/2013, 5:00 PM, Capstone Laboratory

Thursday, March 21, 2013

3/21/2013


Date: 3/21/2013
Time: 6:00 PM
Place: Capstone Laboratory
Assistance:
  • José D. Fernández
  • Samuel Carlo
  • Frances Acevedo
  • Marycarmen Torres
  • Carlos Cruz
Agenda:
  • Items Arrived:
    • None since last meeting
  • Progress:
    • José D. Fernández-Testing DB tables 
    • Frances Acevedo- HTML, CSS tutorials
    • Samuel Carlo- Understanding of the XBee Interface
    • Marycarmen Torres- XBee Programming
    • Carlos Cruz- XBee programming
  • Problems?
    • Parts that have not arrived yet
Responsabilities for next period:

  • José D. Fernández- Start Inventory system app
  • Samuel Carlo- Start XBee computer interface
  • Frances Acevedo- Start informational website
  • Marycarmen Torres- Continue XBee and MSP430 programming
  • Carlos Cruz- Continue XBee and MSP430 programming

Next Meeting: 3/30/2013, 5:00 PM, Capstone Laboratory



Tuesday, March 19, 2013

3/19/2013

Date: 3/19/2013
Time: 6:00 PM
Place: Capstone Laboratory
Assistance:

  • José D. Fernández
  • Samuel Carlo
  • Frances Acevedo
  • Marycarmen Torres
  • Carlos Cruz
Agenda:
  • Items Arrived:
    • XBee's 
    • MSP430's
    • Temperature and humidity sensors
  • Progress:
    • José D. Fernández-Creating DB tables 
    • Frances Acevedo- HTML, CSS tutorials
    • Samuel Carlo- Understanding of the XBee Interface
    • Marycarmen Torres- Soldering XBee modules
    • Carlos Cruz- Basic XBee programming
  • Problems?
    • Parts that have not arrived yet
    • Add functionalities to the project based on the last happy hour
Responsabilities for next period: Continue with current progress

Next Meeting: 3/19/2013, 6:00 PM, Capstone Laboratory




Thursday, March 14, 2013

Happy Hour #1

This week we have done several things:
  • Meet with professor Beauchamp to talk about our control system and some details that are still missing or not calculated.
  • We sent an email to see if we could complete our project on site and the professors could evaluate it there.
  • Practice our parts for the happy hour which will be just a few hours after this post
  • Parts have arrived and we have started the implementation
  • Our client sent us the information for the web host which he is paying so the software part implementation has also begun.

Saturday, March 9, 2013

progress report deadline extension

We were given a time extension for the progress report and, therefore, we verified all parts carefully and will be submitting it as soon as all the parts are completely finished and moodle is back up.

Thursday, March 7, 2013

Progress report 1

Almost all the parts for the progress report are completed, some minor details are still missing like the format for page numbers, appendices, etc.. We should finish the complete report tomorrow before the deadline

Sunday, March 3, 2013

Finished design phase presentation

Today we finally finished the presentation with the basic design specifications. Some other more specific details are still unfinished but we will finish them on time for the progress report.

Tuesday, February 26, 2013

design phase

estos ultimos dias hemos comenzado la fase de diseno de nuestro proyecto. Falta todavia pero vamos a buen paso para terminar con tiempo la presentacion y el reporte de progreso

Tuesday, February 12, 2013

Project Proposal Final Version

Today all the members have finished working with the assigned part of the proposal. We used the appendix as professor  J. Fernando Vega had proposed. And now we are putting everything together in order to check that everyone did the work and it has no grammatical errors.  

Sunday, February 10, 2013

February 10

Today we kept working on making the necessary changes to our parts of the proposal. This changes were proposed by d. Fernando Vega in our initial proposal draft. Many of the other changes were explained in a meeting with him last Wednesday in which the use of an appendix could greatly help in detailing some of the parts. We should all finish our parts for tomorrow to properly join them in a document with all the necessary format changes.

Saturday, February 9, 2013

Reunion 9 de febrero de 2013

El día de hoy nos dedicamos a analizar las partes del proposal (Draft) que cada uno hicimos y que partes debemos editar, eliminar, mejorar y que otras cosas podemos añadir de beneficio al proyecto.

Las partes asignadas a trabajar cada miembro del equipo son las mismas ya con las recomendaciones de los profesores. Mañana en la reunión continuaremos editando y mejorando el proposal final

Monday, February 4, 2013

Taller Sobre Diseño

En el día de hoy, el grupo se presento para escuchar y aprender sobre un taller de diseño llevado a cabo por el profesor Ivan Baiges. Donde se discutieron muchos puntos importantes como:

  • El significado de diseño.
  • El significado de un proyecto.
  • Tener bien definido lo que es un "scope", "time", "performance" y "cost".
  • Nos hablo sobre el QFD (Quality Function Deployment).
  • Y nos hablo sobre el Product Design Specification (PDS).

Sunday, February 3, 2013

Presentation1

In the meeting that was taken place today:

  • Each member did a part in the power-point.
  • We looked for ways to keep the presentation short and to the point.
  • We discussed how we were going to present to the public, so that we can keep the presentation for up to 5 minutes.

Thursday, January 31, 2013

     En el dia de hoy terminamos las partes asignadas a cada integrante del grupo y las unimos en un mismo documento. Adicional a esto aclaramos que el elemento adicional de hardware de el proyecto lo era un sensor de temperatura y humedad que cuando llegaba a ciertas medidas encendia uno o varios abanicos conectados a los sensores. Al enviar la señar de prender se enviará tambn los datos de temperatura y humedad con un XBee a la computadora para llevar un tipo de log con esa informacion y el dia y hora en q ocurrio.

     Luego de juntar nuestras partes verificamos el contenido de la propuesta y añadimos partes adicionales que hacian falta para completarla. Estas partes eran:

  • tabla de contenidos
  • bibliografia
  • portada
  • executive summary
Luego de completar la propuesta la grabamos como PDF, la juntamos con el schedule en MS project y la enviamos en un zipped folder por Moodle.


Reunion del miercoles 30 de enero del 2013

El día de hoy estuvimos reunidos a partir de las 7:00 p.m. para trabajar en nuestras partes del reporte he hicimos las asignaciónes y quizes asignados en moodle.

Tuesday, January 29, 2013

Reunión del martes 29 de enero de 2013


El día de hoy estuvimos reunidos a partir de las 6:00 p.m. para seguir trabajando y elaborando en nuestras respectivas partes de la propuesta del proyecto. Éstas se acordaron en la reunión del lunes 28 de enero.

También tomamos la oportunidad para comparar ideas de cómo exactamente se estará implementando el smart barcode scanner, y miramos los costos de varios modelos 
con los que podríamos estar trabajando.

Monday, January 28, 2013

Reunion del Lunes 28 de enero de 2013

El día de hoy estuvimos reunidos a partir de las 7:00 p.m. para concretar los detalles de la propuesta del proyecto. Nos repartimos las áreas de la propuesta en las que cada uno de los integrantes va a participar. A nuestro grupo se unió un nuevo integrante Carlos J. Cruz.

Samuel Carlo - Problem Statement and Project Antecedents
Jose Fernandez - S.M.A.R.T.E.R, Resource Requirements and Budget
Frances Acevedo - General Aproach and Market Overview
Marycarmen Torres - Risk Management, Assesment Methods and Impacts
Carlos Cruz - Schedule and Personnel

Executive Summary y Style & Presentation se estará trabajando entre todos los integrantes del grupo.

Sunday, January 27, 2013

Homework-1

El día de hoy hemos estado trabajando toda la tarde, con la primera asignación basada en nuestra propuesta del proyecto. Trabajamos en conjunto cada una de las partes del proyecto pero fueron encargadas las siguientes partes a cada uno:

Frances Acevedo: Project Objective, Blog, y Logo
Samuel Carlo: Project Outcomes, Team Name, y Logo
Marycarmen Torres: Project Outcomes, Logo y  Redacción de Web Page
Jose Fernandez: Creación de Web Page y Logo

Se escogió el titulo del proyecto entre todos los integrantes y se escogió como líder del grupo a Jose Fernandez.

Saturday, January 26, 2013

Asignación de Grupo I


En el día de hoy hemos estado continuando con la redacción de la propuesta, cada uno con las partes que se le habían asignado en la clase del viernes  25/enero/2013.
  • Problem Statement: Samuel Carlo
  • Objectives: Jose Fernández
  • Risk Management: Marycarmen Torres
  • Market Overview: Frances Acevedo
A raíz de haber hablado con el cliente de nuestro proyecto, nos asignamos unas tareas para hacer mas investigación al respecto.
  • Buscar información de como conectar "wirelessly" un dispositivo a la base de datos y el blog - Frances Acevedo
  • Buscar información sobre el scanner - Marycarmen Torres
  • Hacer el website - Jose Fernández
  • Buscar información de la base de datos y el servidor - Samuel Carlo